The 9 stages of a FieldKo implementation.
User Permissions Needed
1. Plan
- Understand what the FieldKo packages add to Salesforce and how the FieldKo Atlas app fits in. See FieldKo on the Lightning Platform and FieldKo for Admins.
- Confirm the licensing model and which license each user needs. See How FieldKo Licensing Works.
- Agree the store segments, visit frequency, and call cycles. See Set Up Call Cycles, Tasks, and Visit Templates: Best Practice.
- Agree what reps record on each visit, and how you’ll report on it. See Build Surveys: Best Practice and Design Surveys and Tasks for Reporting.
- Identify anything the customer needs that isn’t standard FieldKo, and discuss it with FieldKo. See Extend FieldKo Safely.
- Plan the pilot and its gates. See Run a 90-Day Pilot below and FieldKo’s 90-Day Improvement Plan template.
2. Prepare a Sandbox
- Build and test in a sandbox before production. See Manage Releases: Sandboxes, Deployments, and Package Upgrades.
3. Install and Configure
- Install both packages and complete setup in the order the guide gives. See Install and Set Up FieldKo.
- Decide which objects, fields, and records sync to reps’ devices, and run the Metadata Collector. See Control What Syncs to the App.
- Set up call cycles, task types, visit templates, and visit types. See Set Up Call Cycles, Tasks, and Visit Templates.
- Build questions and surveys. See Build Surveys.
- Set up products, price books, and ranging, if reps order or record ranging. See Set Up Products, Ordering, and Ranging.
- Set up turn-in orders, if the customer sends orders to a wholesaler. See Set Up Turn-In Orders.
- Review the custom settings and custom metadata that affect the app. See Configuration Reference.
4. Set Up Users and Access
- Choose the license, profile, permission sets, and role for each type of user. See Recommended Access by Role.
- Choose org-wide defaults and sharing. See Security Model and Sharing.
- Choose how managers see their reps. See Set Up Manager Visibility.
- Set up login and session policies for reps who work offline. See Login and Security.
5. Load Data
- Load stores, products, price books, ranging, call cycles, and visits in the right order. See Import and Update Data.
- Check data quality before go-live. See Keep Data Clean and FieldKo’s Store, Product, and Campaign Data Readiness checklist.
- Plan for data volume and storage. See Plan for Data Volume, Storage, and Retention and Storage and API Allowances. API stands for application programming interface.
6. Customize, Automate, and Integrate
- Add fields and picklists reps need in the app. See Add Fields and Picklists to the Mobile App.
- Write validation rules and automation that don’t block reps’ syncs. See Record Types and Validation Rules and Design Automation for FieldKo.
- Connect other systems through an integration user. See Integrate FieldKo with Other Systems and API and Platform Limits.
- Set up report folders, report types, and dashboards. See Report Folders, Sharing, and Custom Report Types and Dashboard Running Users and Reporting Snapshots.
7. Test with Pilot Reps
- Set up test reps. See Add a New Rep.
- Run end-to-end tests on real devices: plan a visit, complete it in the app, sync, and check the results in Salesforce and in reports. See Test New Versions of the App and Launch a New Survey or Field Campaign.
- Check each pilot rep’s syncs. See Diagnose Rep Issues.
8. Go Live
- Deploy your changes to production, following the same order. See Manage Releases: Sandboxes, Deployments, and Package Upgrades.
- Add every rep and manager. See Add a New Rep.
- Send reps the app and their first-day guide. See Send Reps the App and Your First Day with FieldKo Atlas.
- Walk managers through their first week. See Plan Your Team’s First Week.
9. Hand Over
- Show the customer’s admins the day-to-day tasks: Add a New Rep, Move a Rep to a New Territory, Add a New Store, Add a New Product or Range, and Remove a Rep’s Access.
- Show admins and managers where to start when something goes wrong. See Common Questions: Troubleshoot by Symptom.
Best Practice
Run a 90-Day Pilot
Before you roll out everywhere, prove a focused operating model in real stores: one business problem, a trusted baseline, a practical field workflow, and a written decision at each 30-day gate. Use this for a new rollout, a new region, or a major change to how visits, surveys, or exceptions work.

The 90-Day Pilot: Phases, Gates, and Stop Signs
1
Days 1 to 30: Understand and Design
Interview and shadow reps, area managers, and commercial teams. Agree the business objective, pilot stores, and product scope. Write a short metric dictionary that defines in-stock, authorized, visited, and resolved, and record a baseline for 2 or 3 outcomes. Save the pilot stores as an account set.Gate: you have enough reliable information to design a focused pilot.
2
Days 31 to 60: Pilot in Real Conditions
Run a short standard visit, the must-stock list, a few priority metrics, and an exception process in the pilot territories, rolled out as a field campaign on the pilot account set. Watch how long visits really take, check a sample of evidence, run a weekly exception review, and fix the design quickly.Gate: the field workflow is practical, and the action process works.
3
Days 61 to 90: Stabilize and Scale Deliberately
Compare results with the baseline and with similar stores outside the pilot. Review sync timeliness, completeness, and evidence quality. Refine tiers and task lists, set change control for questions, products, campaigns, and metric definitions, and plan a staged expansion.Gate: the evidence supports scaling without multiplying unresolved problems.
Fictional Example
A made-up snack company, Redwood Pantry, pilots in 3 territories with 12 reps and 180 stores, targeting availability of 15 must-stock products.- Day 30 baseline: 2,322 of 2,700 checks present, so observed on-shelf availability (OSA) is 86%.
- Day 45: visits run 12 minutes over plan because the survey has 40 questions. The team cuts it to 18.
- Day 60 gate: 2,457 of 2,700 present, 91%. Sync Details show 2 reps with repeated failed syncs, which the admin fixes.
- Day 90 gate: results hold, weekly reviews run without the central analyst, and expansion to 2 more territories is approved.
What to Measure
What to Do When It Goes Wrong
Pilot Checklist
- Name a sponsor, a program owner, and the pilot region.
- Write the business objective, baseline metric, and success criteria.
- Agree the metric dictionary and the must-stock list.
- Choose representative pilot territories, not only the easiest ones.
- Run weekly exception reviews from day 31.
- Record a decision at each gate, and check the stop signs before any expansion.